Organic Tomato Greenhouse
Hanford, California
This is a two-bay
greenhouse project built between September 8 - November 7, 2003
Back to Current Projects
Back to
"Fresh Off the Vine page"
Next
Construction Page
Previous Construction Page October 20-24, 2003 - Hanging
equipment, finishing end walls
| Heaters and
fans ready to install |
 |
| Framing
porches and end wall |
 |
| Covering
front end wall with T-111 siding on the lower portion, polycarbonate
above |
 |
| Heaters hung
and the jet fan ready to be lifted. |
 |
| Laying out
the parts for the evaporative cooling wall door |
 |
| Assembling the
evaporative cooling wall door |
 |
| Evaporative
cooling wall door complete and installed |
 |
| Motor to open
and close the evaporative cooling wall door |
 |