John Pade and Hopeton
Singh discussing
the greenhouse construction |

The greenhouse frame |
|

Beginning to roll out
the greenhouse covering |

John and Jason rolling
out one of the covers |
|

Securing the cover on
the south end |

Bill Oberthier holding
the cover
while it is secured. |
|

John and Hopeton
installing the surelock cap |

Top and bottom cover
secured |
|

John Pade and Bill
Oberthier
discussing strategy |

Both bays covered |
|

Dick and Jason wiring
the sub-panel |

Hi Cross and Hopeton
(far left and left) make plans
while the guys begin placing the Dutch buckets |
|

John Pade building a
temporary chiller out
of locally-available materials to cool
the incoming 80F water. |

The ice is delivered
for the chiller |
|

The chiller plumbed
and cooling the
water to 60F, a 20 degree drop. |

The Dutch buckets set
into place. |